METKA EGN successfully completed the engineering, procurement and construction of the innovative electricity production system at the ADAM oil concession, located in the Tataouine governorate of Tunisia, which was inaugurated on December 11th 2019. The system included the installation of a solar plant with a capacity of 5 MW along with a battery energy storage system, integrated with existing gas turbines in an off-grid configuration, resulting in reducing gas consumption and saving over 6,500 tons of CO2 emissions per year. This hybrid generation system, which combines gas, photovoltaic and storage, is one of the most important and innovative in the world.