5,5 MWp ADAM, TUNISIA

Hybrid / Solar PV / Storage

PROJECT SUMMARY

ADAM hybrid project involves the installation of a 5.5 MWp hybrid power plant, close to the ADAM existing oil concession of Eni Tunisia facility located in the Tataouine governorate of Tunisia, consisting of solar power together with a battery energy storage system and an Energy Management System. The project’s target is to reduce fuel gas consumption up to 50% of the generator thanks to Energy from the ADAM hybrid power plant.

The scope of METKA EGN includes the interconnection to the existing facilities of ENI Tunisia. Since PV plant installation shall not introduce risks of loss of production of oil & gas for the facility, the energy storage system will be installed to cover power fluctuations of the PV system due to weather variability and avoid sudden load variation on gas turbine.

TUNISIA

5,5 MWP

WHERE

32°55’15.9″N
10°27’02.9″E